"Preventative Maintenance - 2003"
The Robertstown Holy Cross Lutheran Church Inc., recently were bequest a block of land that adjoins the Church & Manse property.
Mrs. TA (Nell) Noske, a life time member of the church, donated the land, to the church which also contains a large shed and bore.
Tenders were request from the public to lease the block and the successful persons were Adrian & Val Menzel of Robertstown.
Within their tender they indicated that they were not going to use the bore, so the Church Council decided to pull up the pump before it deteriorated to the extent that it would cost a great deal of money to replace it at a later date.
On Friday, 18th July 2003, some members of the congregation, Dean, Kelvin & Andrew Ruediger and Scott Schaefer in conjunction with Mr. Brian Quick from Manoora (Bore Contractor) went through the process of pulling it up.
The following is photos of the process:
When completed, some measurements were taken:
| Item | Length/Size - Imperial | Length/Size - Metric | Item | Length/Size - Metric | Length/Size : Imperial |
| Bore Diameter: | 7 inches | 18cm | Water Depth: | 20 feet | 6.1 metres |
| Pipe Diameter: | 4 inches | 10cm | Pump Depth: | 194 feet | 58.8 metres |
| Pipe Length: | 21 foot 6 inches | 6.5 metres | Pump Length: | 10 feet | 3 metres |
| These
pages best viewed at 800x600 and high-colour, using
Internet Explorer 4.01 SP1 and above or Netscape 4.06 and above.
|
|
| Last modified: April 12, 2006 |
Copyright © 2002 |
| Site Map | |